Skip to content

Roofing

Roofing for Homes West and South of Cleveland

Buckeye Exteriors replaces and repairs roofs for homes west and south of Cleveland, and because we also do siding, fascia, and gutters, the roof edge gets planned as one job instead of three. Ask which roofing systems Buckeye installs when you request an estimate; we will match the system to your house and budget.

House with gray siding and a new roof from Buckeye Exteriors' portfolio

This page covers how Buckeye approaches roof work, with links to the replacement and repair pages for details.

Is this right for you?

Who calls us about roofing

Most roofing calls come from owners with a leak, storm damage, or a roof that is visibly near the end of its life.

A good fit when you have

  • Leaks, stains on ceilings, or water in the attic
  • Missing or lifted shingles after a wind storm
  • An aging roof you want replaced before it fails
  • Owners re-siding or replacing gutters who want the roof edge done at the same time

What to look for

Signs your roof needs attention

01

Water stains inside

Ceiling stains and damp attic sheathing mean water is already getting through.

02

Missing or lifted shingles

Wind lifts and tears roofing, especially along edges and ridges.

03

Granules in the gutters

Heavy granule loss on asphalt shingles is a sign of aging.

04

Ice dams in winter

Thick ice at the eaves can push water under roofing and into walls.

05

Sagging or soft spots

A roof deck that gives underfoot or sags between rafters needs a closer look.

Options

Roofing services, and systems to ask about

Buckeye replaces and repairs roofs. Ask at your estimate which roofing system fits your house.

Buckeye installs

Roof replacement

Full tear-off and a new roof system over a sound deck.

Buckeye installs

Roof repair

Fixing leaks, storm damage, and failed flashing on part of the roof.

Ask at your estimate

Asphalt shingles

The most common roof on Cleveland-area houses. Ask which shingle systems Buckeye installs.

Ask at your estimate

Metal roofing

Standing-seam and other metal roofs.

Ask at your estimate

Flat and low-slope roofing

Membrane roofs for porches, additions, and flat sections.

Real Buckeye projects

Roof-edge projects

We have not published a roofing project write-up yet. This fascia job shows the roof-edge work Buckeye pairs with roofing.

Fascia after aluminum wrapping
Fascia before aluminum wrapping
BeforeAfter

Fascia Wrap & Lead Compliance

Lead-Safe Fascia Wrap

Brooklyn Centre, Cleveland

Fascia wrapped in place to address lead-related concerns, coordinated with a lead inspector.

The existing fascia was wrapped in place, and the work was coordinated with a lead inspector to meet the city's requirements.

Read the project story

How the job runs

How a roofing job runs

  1. STEP 1

    Inspect

    We look at the roof surface, flashing, and edges, and check inside for leaks where we can.

  2. STEP 2

    Recommend

    We tell you whether repair or replacement makes sense, and why.

  3. STEP 3

    Estimate

    The written estimate lists the work, materials, and any deck repair expected.

  4. STEP 4

    Do the work

    Repair or replacement is scheduled around weather.

  5. STEP 5

    Clean up

    Debris is cleared and the job is walked with you.

What is included

What a roofing estimate covers

  • The roof system and materials to be installed
  • Tear-off and disposal where the job is a replacement
  • Deck repair expectations and how extra repair is priced
  • Flashing and edge details
  • Cleanup

Your written estimate is the final word on scope and materials.

Timeline

What affects roofing timelines

Roofing is weather-dependent. We schedule after the estimate and adjust for conditions.

Weather
Rain, wind, and cold stop roofing work.
Roof size and pitch
Large and steep roofs take longer and need more safety setup.
Deck condition
Rotted decking found during tear-off has to be replaced first.
Layers
More than one old layer means a longer tear-off.

Cost factors

What drives roofing cost

Roofs are priced by area, with adjustments for pitch, layers, and details. We will price your roof after an inspection.

Roof area

Measured in squares (100 square feet each).

Pitch and height

Steeper and taller roofs need more labor and safety equipment.

Tear-off layers

Each extra layer adds removal and disposal.

System chosen

Different roofing systems have very different material costs.

Talk to Buckeye

Questions about your project?

Call or text to talk through siding, trim, roofing, or gutters. We are available Monday through Saturday.

Greater Cleveland

What Cleveland winters do to roofs

Cleveland Hopkins averages 63.8 inches of snow a year and about 20 days with an inch or more of snowfall. Snow that melts during the day and refreezes at night builds ice at the eaves, and that ice can push water up under roofing.

Wind is the other threat. NOAA's Storm Events Database lists thunderstorm wind reports on 66 days in Cuyahoga County from 2016 through 2025, plus high-wind reports on 17 days. Those reports do not mean every roof was damaged, but they explain why wind-lifted shingles are a common call here.[1][2]

average annual snowfall at Cleveland Hopkins
63.8″[1]
days with thunderstorm wind reports, 2016–2025
66[2]

Questions

Frequently asked questions

Does Buckeye Exteriors do roofing?

Yes. Roof replacement and roof repair are Buckeye services. Ask which roofing systems Buckeye installs when you request your estimate.

Can you do my roof and siding at the same time?

Yes. Planning both together lets the fascia, drip edge area, gutters, and siding at the roofline be sequenced in the right order.

Is storm damage to my roof covered by insurance?

It depends on your policy and on what caused the damage.

Talk to Buckeye

Questions about your project?

Call or text to talk through siding, trim, roofing, or gutters. We are available Monday through Saturday.

  • 4.9 Google rating (18 reviews)
  • Bonded & insured
  • 30-year craftsmanship guarantee

Request your estimate

Send your ZIP and a phone number or email. We will follow up to schedule a visit.

Request a free estimate

By requesting an estimate, you agree that Buckeye Exteriors may call or email you about this project. See our privacy policy.

Sources

  1. 1.U.S. Climate Normals 1991–2020, Cleveland Hopkins International Airport (USW00014820), NOAA National Centers for Environmental Information. Accessed Nov 17, 2026.Freeze-thaw days are derived: average days with a low at or below 32°F minus days with a high at or below 32°F. One airport station; lakeshore and snowbelt areas differ.
  2. 2.Storm Events Database, Cuyahoga County, Ohio (2016–2025), NOAA National Centers for Environmental Information. Accessed Nov 17, 2026.Counts are events reported to the National Weather Service, not damage to any individual home.
Call nowFree estimate